The hospital is expected to be ready by the end of February, it will be equipped with respiratory triage, stabilization and hospitalization areas with a capacity of 100 beds, of which between 25 and 30 will be intensive therapy

Facebook Comments

This post was originally published on this site

Roland Millaner